Quantcast
Channel: SCN : All Content - Process Integration (PI) & SOA Middleware
Viewing all articles
Browse latest Browse all 7030

Number of RFC destinations required to be created at ECC and in NWA for sending IDOCs from ECC to PI in SAP PI Single Stack

$
0
0

Hi Experts,

 

I have read many blogs regrading IDOC configurations that needs to be done for SAP PI 7.31 single stack.

Some of them have mentioned as one, some as 3.

 

Even i have used 3 rfc destionations in my project.

 

why do we create 2 rfc destinations with same PID and one rfc destionation with out PID.

 

Please throw some light on this

 

Thanks,

Rohini


Viewing all articles
Browse latest Browse all 7030

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>