Hi Experts,
I need to know what all the preproduction jobs and configuration details in SAP PI 7.3 to be done before going live
For Ex:
- Archiving has to be activated and the archiving parameter
- Schedule job to avoid the database size from growing
- Message archiving for new interfaces need to be configured
- Daily Monitoring Report need to be generated for performance analysis
and trouble shooting
Please do add if i missed any other configuration that needs to be placed.Do let us know what are the task need to be carried out by BASIS
Thanks for your help
Regards,
Dinesh