Hi
We are currently on PI 7.01 and would be upgrading our PI system. Need some inputs with respect to following stuff.
Due to complex BPM scenarious that we have, we would defintely go with dual stack only. The question comes more in respect to the following.
1. Is it advisable to go PI7.11 ? - Seems like there is a upgrade path and the hardware does not change and all interfaces is easily migrated without much effort.
2. Is it advisable to to PI 7.3.1 ?- Though dual stack is not an issue , heard the hardware is different and would require considerable effort in migrating interfaces and also no upgrade path between 7.01 to 7.3.1
Please let me other factors to consider with respect to licensing cost as we are currently in volume based.
We have limited time and limited budget but also need to consider the future. Your comments are highly valuable.
Regards
Sam