We are upgrading SAP Process Integration (PI) from 7.11 to 7.4 with option new installation and phase out. We are going from dual stack to single stack and will have the two PIs running parallel for a longer period.
- Which are the issues we can run into using same System Landscape (SLD) for both PI systems?
- We found that it is not possible to have two Business Systems (BS) connected to the same ABAP Technical System with the same client. Will it be possible to reuse the existing BS, which is then still connected to the PI 7.11, for PI 7.4?
- WIll it be possible in production SLD to switch the Integration Server for backend ABAP BS?
- How did you setup the SLD when new installation?
Best regards,
Maria S. L.