Well met
Problematic:
Messages are stuck in ECC with the scheduled green flag they don't reach XI/PI
Background
We recently did a full copy of our production environment (ERP) to our quality environment, (ERX) afterwards the messages that go
ECC(ERX) > PI(PIX) > Oracle stopped working they are stuck with a scheduled status the messages that go the other way
Oracle > PI(PIX) > ECC(ERX) are working correctly as intended.
Things verified so far
ECC
sxmb_admin >Integration engine (ok) verified
sldapicust > test (ok)
sldcheck > (ok) Connection to SLD works correctly
smq2 > deleted all ques new ones are stuck
SPROX_CHECK_IFR_RESPONSE (ok) date understood
SPROX_CHECK_HTTP_COMMUNICATION > (ok) HTTP communication functioning
SPROX_CHECK_IFR_CONNECTION > (ok) functioning correctly data understood
SPROX_CHECK_IFR_ADDRESS > (ok) OK: Address maintained
sm59 > SAP_PROXY_ESR rfc tested ok
Did a search on the site but couldn't find anything else that answered my problem
Thanks in advance for your help