Hello experts,
We are currently running PI 7.11 sp10. We have our back-end system as ECC6.0 EHP6. We also have a 3rd party system (non-SAP) in the mix.
our PI dev team is reporting these constant errors:
("system" type errors in the SXMB_ADMIN when looking at the "Monitor for processed XML messages"
as you can see above, the error is HTTP 413 Request Entity is too large.
We've had a PI solution for many years, and never needed to change any "default" message sizes.
So how to change it??? I'm assuming of course that this is the problem....
I did quite a bit of research before choosing to open this thread and found the following:
I’ve looked through all these threads/notes:
http://help.sap.com/saphelp_nw70/helpdata/en/1a/dbd2ba84b97144b922e8cb281ac18d/frameset.htm
http://scn.sap.com/thread/1497760
Note:
657759 - "413 Request Entity Too Large" on J2EE Engine
Even with the above information, I can’t figure out where the “maxRequestHeader” or “maxContentLength” parameter is in the HTTP provider service on a PI 7.11 system.
I can go into NWA and configtool, but still, I can’t figure it out.
The above threads/notes assume you are on NW7.0, but again, we are on 7.11.
I'll probably end up opening a message, but any help much appreciated.
Thanks,
NICK (basis team)