Hi expert,
I have configured SLD group according to below link .
Transport Targets and Groups in the SLD
for PI and ECC system i have assigned transport target.
we have third party system also defined in SLD there name is same in PI dev ,PI quality and PI production.
how to proceed to set transport target for third party system if name is same ?
Thanks,
Dipak Patil