Quantcast
Channel: SCN : All Content - Process Integration (PI) & SOA Middleware
Viewing all articles
Browse latest Browse all 7030

Phased migration of SAP XI 7.0 to 7.31

$
0
0

Hi

  We are planning to do a phased migration of SAP PI 7.0 to 7.31. We decided to go with new installation of 7.31 so we can have less downtime during our migration process. We have 200+ interfaces out of which 160+ are either inbound or outbound from SAP ECC using IDOC/Proxy/JDBC/FTP/Rosettanet adapters. The following are my questions

 

- Is there a possibility of moving few interfaces at a time so we wont cause impact to our business operations or potential risk

- Can we run PI 7.0 and PI 7.3 for a period of time till we complete entire migration

- Can we move 10 outbound idoc interfaces out of 20 outbound idocs and use same approach for inbound idocs/proxy/JDBC etc.

 

I saw the blogs on this where they ask some modifications to be done for proxy interfaces so ECC can connect to multiple PI systems. Want to know anybody who did a successful migration similar to this.

 

Thanks in advance.

 

Thanks

Kannan


Viewing all articles
Browse latest Browse all 7030

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>