Hi,
Our SAP system systems are currently running in a data center with AIX Unix Operating system and these will be moved to data center running on SUSE Linux. A new PI 7.3 system will be installed at the target data center and objects from PI 7.0 will be moved to PI 7.3,meanwhile we are planning to do a system copy for a PI 7.0 system at the target side as a backup.Please let us know whether any manual changes need to be done in the communication channel or not. Also, any redevelopment is needed for BPM, Custom module, ABAP and JAVA mapping in the new environment after system copy of PI 7.0.
Thanks in advance.
Best Regards,
Vignesh